The steel structure of the dome of the "Mosquee de Kiptchak Turkmenistant" with a total weight of approximately 240 tons and a financial volume of CZK 8,5 million was manufactured in 2004 for a French investor.
The steel structure of the savings bank in Pforzheim, Germany, with a total weight of 860 tons of steel elements,, was manufactured for Stahlbau Main, Erlensee in 2000, and the total value of the contract was over CZK 24 million.
The steel silo of the storage tank with a volume of 900 m3 and a weight of 116 tons was realized in 2010 for the Devil's Stairs lime plant in Tman, with a total value of CZK 5,5 million.
In 2013, a portal for a lattice crane to Monaco with dimensions of 6x6x6 m was manufactured for our pilot customer, the German company Liebherr. This order was specific with its requirements for a high accuracy. Individual parts with a total weight of 20 tons were inspected in P...
The dome of the parliament building in Ashgabat, the capital of Turkmenistan, with a total weight of 70 tons, was made for a French investor. After a control assembly at the Prerov plant, it was dismantled and transported to the destination by rail.
Steel frame for vibrating machine HD 90 HAMM, Germany, for road surface treatment. PROGRESS OK a.s. participated for a short time in the production of skeletons for road rollers fi. HAMM.